Interpretation Sort ascending Code Type Edition Published
106.3.1 - Building Code Summary Administrative 2018
106.1- Closed Crawl Space Moisture Control – Permitting and H3 Licensure Administrative 2018
106.1 - Pier Dock Bulkhead and Waterway Structure Permit Requirements Administrative 2018
106.1 - Pier Dock Bulkhead and Waterway Structure Permit Requirements Administrative 2012
106.1 - Permit Required for Closed Crawl Space Administrative 2018
106.1 - Permit Required for Closed Crawl Space Administrative 2012
106.1 - Closed Crawl Space Moisture Control - Permitting and H3 Licensure Administrative 2012
106 - Fast Track Permits Administrative 2012
106 - Fast Track Permits Administrative 2018
105 - Log Cabins Administrative 2012
105 - Approvals of Alternative Material Design and Methods and Specific Test Standards Administrative 2012
104.1.2 - Plan Review by Contract Consultants (1) Administrative 2012
104.1.2 - Plan Review by Contract Consultants Administrative 2018
1030.1 - Emergency Escape and Rescue Opening Requirements for Church Classrooms Building 2018
1029.1 - Emergency Escape and Rescue Opening Requirements for Church Classrooms Building 2012
1028 - Means of Egress Related to Bleacher Seats Building 2012
1023.5 - Electrical Outlet Penetrations of Rated Exit Enclosure Membranes Building 2018
1023.1 - Exit Stair Enclosures Building 2018
1022.4 - Electrical Outlet Penetrations of Rated Exit Enclosure Membranes Building 2012
1022.1 - Vertical Exit Enclosures in a Mixed Occupancy Building Building 2012
1022.1 - Exit Stair Enclosures Building 2012
1020.1 - Table 1020.1 Footnote F Building 2018
1020.1 - Rated Corridor in Day Care of Educational Occupancy Building 2018
1020.1 - Floor-Ceiling Rating Requirement Building 2018
1018.6 - Corridor Continuity at Toilet Rooms Building 2012