| Sample Resolution for Insurance District |
Forms |
|
| Sample SOGs |
Forms |
|
| Sample Training Sign In Sheet |
Forms |
|
| Scheduling an Exam |
Memos |
|
| School Director Class PowerPoint |
Policies |
|
| School Maintenance Rules and Regulations |
|
|
| Section 110.26(C)(2) - Egress and Working Clearances of Large Equipment |
Interpretations |
|
| Section 210.11(C) - Required v. Non-Required Receptacles |
Interpretations |
|
| Section 314.27(C) - Ceiling Boxes for Paddel Fans |
Interpretations |
|
| Section 680.74 - Listed and Labeled Hydromassage Bathtubs |
Interpretations |
|
| Section 90.7 - Qualified Testing Laboratories |
Interpretations |
|
| Sections 10.1 and 10.2 - One- and Two-Family Exception Scope |
|
|
| September 10, 2024- BCC Minutes (Final) |
|
|
| September 2021 |
Hearing Notice |
|
| September 2021 BCC Notice of Hearing |
Hearing Notice |
|
| September 21-2022 Education Committee minutes._approved.pdf |
|
|
| September 21-2022 Education Committee minutes._approved.pdf |
|
|
| September 21-2022 minutes.docx JH_BW_mjh_approved.pdf |
|
|
| September 28-2023 minutes FINAL .pdf |
|
|
| September 28-2023 minutes FINAL .pdf |
|
|
| September 28-2023 minutes.pdf |
|
|
| Session Law 2024-57 |
|
|
| Set Up Contractor License Course and Test Notice 2020-21.pdf |
|
|
| Set Up Contractor License Course and Test Notice 2020-21.pdf |
|
|
| Setup Contractor Bond Form.pdf |
|
|
| Setup Contractor Exam Schedule.pdf |
|
|
| Setup Contractor Exam Schedule.pdf |
|
|
| Setup Contractor Notice and Test Dates 2020-21.pdf |
|
|
| Setup Contractor Notice and Test Dates 2020-21.pdf |
|
|
| Setup Contractor Notice and Test Dates 2021-22.pdf |
|
|
| Setup Contractor Notice and Test Dates 2021.pdf |
|
|
| Setup Contractor Notice and Test Dates 2022-23.pdf |
|
|
| Sheathing Inspections and NCGS Session Law 2023-108 |
|
|
| SL 2019-174 Residential Plan Review Checklist Guidance |
Interpretations |
|
| SL 2022-46 Temporary Reduction in Duct Insulation Levels For Commercial Buildings |
Interpretations |
|
| SL 2022-46 Temporary Reduction in Duct Insulation Levels For Residential Buildings |
Interpretations |
|
| SL 2022-46 Temporary Reduction in Duct Insulation Levels For Residential Buildings |
|
|
| Smoke Alarm Grants Training powerpoint.pptx |
|
|
| Smoke Alarm Home Survey |
|
|
| Smoke Alarm Installation Program Training |
|
|
| Smoke Alarm Installation Program Training |
|
|
| Smoke Alarm Installation Waiver (English) |
|
|
| Smoke Alarm Installation Waiver (Spanish) |
|
|
| Smoke Alarm Saturday Event letter 2022 |
|
|
| Snow Loading |
|
|
| Snow Loading.pdf |
|
|
| SOP 92925 Committee Mtg Agenda.pdf |
|
|
| SOP Agenda 092121 |
Agendas |
|
| SOP Agenda 2021-12-17.pdf |
Agendas |
|
| SOP proposed changes survey summary.pdf |
Agendas |
|
| SOP Survey RESULTS - TABLE.pdf |
|
|
| SOP-survey-results.pdf |
Agendas |
|
| Speaker Invitation and Proposal Form - Safe Kids Conference (2023) |
|
|
| Special Meeting 3_22_23 Agenda - Draft.pdf |
|
|
| Special Meeting 3_22_23 Agenda.pdf |
|
|
| SPFIF All Risk Coverage Exclusions |
|
|
| SPFIF All Risk Insurance Policy |
|
|
| SPFIF All Risk Insurance Policy |
|
|
| SPFIF General Property Coverage Policy |
|
|
| SPFIF Proof of Loss Form |
|
|
| SPFIF Property_Reporting Form |
|
|
| STAFF REPORT 102522 Final |
|
|
| STAFF REPORT 2023-7-25_FINAL.pdf |
|
|
| STAFF REPORT 2023-7-25_FINAL.pdf ATTACHMENT B |
|
|
| Standards of Practice - 2021-12-17 |
|
|
| Standards of Practice 2022-12.pdf |
|
|
| Standards of Practice 2022-12.pdf |
|
|
| Standards of Practice 2022-4-3 Final-bw.pdf |
|
|
| Standards of Practice 2023-10-2 Final-bw.pdf |
|
|
| Standards of Practice 2023-12 - 14 Final-bw.pdf |
|
|
| Standards of Practice 2023-12 - 14 Final-bw.pdf |
|
|
| Standards of Practice 2023-7-13 Draft-bw.pdf |
|
|
| Standards of Practice 2023-7-13 Draft-bw.pdf |
Agendas |
|
| Standards of Practice 2023-7-13-bw.pdf |
|
|
| Standards of Practice 2024-3 Final-bw.pdf |
|
|