| 101.4.3 - Energy Requirements - HeatingCooling Existing Screened and Enclosed Porches and Dec |
| 101.4.3 - Energy Requirements - Reroofing |
| 101.4.3 - House Bill 201 Impact to the Application of the 2012 NC Energy Conservation Code |
| 101.4.4 - Change in Occupancy or Use |
| 101.4.6 - Energy Requirements For Mixed Occupancy Buildings |
| 101.5.2 - Building Thermal Envelope Requirements for Conditioned versus Unconditioned Space |
| 101.5.2 - Thermal Envelope Requirements for School Stadium Concession Stands |
| 1013 - Guardrails and Handrails on Stairs |
| 1015.2.1 - Measuring Remote Exits from Office Suites |
| 1018.1 - Floor-Ceiling Rating Requirement |
| 1018.1 - Rated Corridor in Day Care of Educational Occupancy |
| 1018.1 - Table 1018.1 Footnote F |
| 1018.6 - Corridor Continuity at Toilet Rooms |
| 1022.1 - Exit Stair Enclosures |
| 1022.1 - Vertical Exit Enclosures in a Mixed Occupancy Building |
| 1022.4 - Electrical Outlet Penetrations of Rated Exit Enclosure Membranes |
| 1028 - Means of Egress Related to Bleacher Seats |
| 1029.1 - Emergency Escape and Rescue Opening Requirements for Church Classrooms |
| 104.1.2 - Plan Review by Contract Consultants (1) |
| 105 - Approvals of Alternative Material Design and Methods and Specific Test Standards |